Fatigue decision record template

This page provides an original template for recording fatigue-related decisions — for example when fatigue risk has been identified, reviewed, escalated, or mitigated before work proceeds.

It records the reasoning behind a decision and may help document why a decision was made. It is a record prompt, not an approval form.

Important disclaimer: Completing this record does not prove the work was safe, does not guarantee compliance, and does not replace your organisation’s procedures or competent person judgement. It does not determine fitness for duty. Should be reviewed by competent persons. Sector-specific requirements may apply. This is not legal advice.

Consider using a decision record when:

  • A roster or assignment has elevated modelled or assessed fatigue exposure
  • Planned work differs from actual hours, travel, or breaks — see planned vs actual fatigue
  • A credible fatigue report has been received — see worker fatigue reporting
  • Overtime, overruns, or shift changes alter exposure from the last assessment
  • Management needs a documented basis for review before proceeding with controls
  • An audit or investigation asks what was known and decided at the time

A record supports accountability — see management accountability for fatigue. It does not replace a full fatigue risk assessment where one is required.

  1. Complete close to the decision — while context is fresh.
  2. Be specific — describe the pattern, deviation, and factors considered.
  3. Name people and roles — not only job titles in the abstract.
  4. Record mitigations — what controls apply if work proceeds.
  5. Set follow-up — when the decision will be reviewed.
  6. Retain the record as part of the audit trail — see fatigue records and audit.

FieldEntry
Record reference / ID
Date and time
Organisation / site / contract
Role(s) or team affected
Reason for record (trigger)
Related assessment reference (if any)

Describe briefly: What decision is being recorded and why now?


RoleName or postInvolvement
Decision-maker (accountable)
Assessor / reviewer
Operational supervisor
Workforce representative (if involved)
Others consulted

FactorPlanned detail
Shift date(s)
Start / finish times
Duty duration
Rest before / after
Consecutive duties in sequence
Breaks planned
Travel / door-to-door (if relevant)

See shift pattern review checklist and door-to-door planning checklist.


FactorPlannedActual / expectedNotes
Shift times
Duration / overtime
Rest gap
Breaks
Travel
Task / workload change

Prompts — check whether:

  • Deviation is temporary or may recur
  • Planned vs actual monitoring flagged this change
  • Reassessment of the underlying fatigue risk assessment is needed

Section 5: Fatigue risk factors identified

Section titled “Section 5: Fatigue risk factors identified”
Risk factorDescriptionSeverity of concern (organisation scale)

Examples to consider: night work, early starts, quick returns, consecutive shifts, long travel, high workload, missed breaks, heat/isolation, disruption.


FieldEntry
Tool / method used
Inputs summary
Outputs (e.g. FI / RI if applicable)
Assumptions documented? (Y/N)
Interpreter name / role

If using a fatigue risk index (FRI), read limitations of fatigue models first. Outputs are modelled estimates — decision-support, not verdicts.


FieldEntry
Any fatigue reports received? (Y/N)
Summary (if yes)
How concerns were considered

Do not dismiss credible reports because a model score looks acceptable.


Section 8: Controls and mitigations considered

Section titled “Section 8: Controls and mitigations considered”
MitigationApplied? (Y/N)Notes
Roster change / recovery period
Task adjustment
Additional supervision
Travel mitigation (passenger, rest, accommodation)
Break adjustment
Other controls

See mitigation and the fatigue risk assessment template for wider control thinking.


FieldEntry
Outcome (describe neutrally)
Conditions attached (if any)
Work proceeds / postponed / redesigned / referred for further review
Date decision effective

Use neutral wording — record what was decided and why, not implied guarantees of safety.


FieldEntry
Named accountable person for this decision
Role / post
Date
Signature / electronic record (per org policy)

Clear ownership supports management accountability. Absence of a named reviewer when exposure is elevated is a governance gap.


FieldEntry
Follow-up actions
Owner
Review date / trigger
What will be monitored (actual hours, reports, incidents)
Follow-up dateWhat was checkedOutcomeReviewer

Following review of the planned pattern, [deviation], workload, travel, and [any model outputs], [name/role] recorded that [summary of fatigue factors]. Mitigations agreed: [list]. The decision taken: [proceed with controls / postpone / redesign / refer for further review]. This record documents the basis for review at the time; it does not confirm legal compliance or that all fatigue risk has been eliminated. Follow-up review scheduled: [date/trigger].

Adapt to your organisation. This example is illustrative only.


  • Approval or authorisation language implying the record permits unsafe work
  • Network Rail exceedance levels, threshold matrices, or standard wording
  • Fitness for duty or medical conclusions about individuals
  • Automatic outcomes from model scores or completed form fields
  • Audit-proof claims — records support assurance; they do not prove safety
  • Replacement of competent judgement, safe systems of work, or statutory risk assessment
  • Driver hours, tachographs, aviation FTL, or fleet compliance
  • Software or product promotion

For how organisational policy relates to law and standards, see law, guidance, standards and policy.